Free working document
The digital vehicle inspection rollout checklist
Everything a shop has to decide, install and say out loud before the first inspection link goes to a customer, and what to check every week afterward.
Most shops that abandon digital inspections did not buy the wrong tool. They skipped the boring decisions: who grades an item red, what the caption has to say, who reviews before the link goes out, and how the technician gets paid for the time. Six weeks later the photos are dark, the captions say worn and the advisor is back on the phone.
This checklist is the working version of those decisions, in the order a shop actually faces them. Print it, mark up what applies to your building, and hand the bay section to your lead technician. Nothing here depends on a particular vendor, so it holds up whether you use InspectBay or run inspections some other way.
Decide before anyone takes a picture
Set up the bay
Run it at the counter
Check it every week
How to use it
Work through it in order over two weeks rather than in one meeting. Week one is the decision list and the bay setup, which is where the arguments happen and where they belong. Week two is the counter routine, run on real cars with one advisor and one technician before the rest of the shop joins.
After the first month, the only part you keep using is the weekly check. Four numbers each Friday, recommended dollars, approved dollars, photos per inspection and declined items rebuilt, will tell you more about the health of the program than any dashboard. Keep the earlier pages for the next technician you hire, because handing them the standard beats explaining it twice.
Send me the editable copy
Send yourself the editable copy so you can cut the items that do not apply to your bays and hand the rest to your lead technician.
Questions about this document
Does this work if we do not use inspection software yet?
Yes. The grading definitions, the required photo list and the caption format are process decisions, not software settings. Shops running photos through a phone and a shared folder still benefit from writing them down, and the checklist carries over when you do adopt a tool.
How long before we see a change in approval rate?
Most shops see movement inside four to six weeks, once technicians stop thinking about the camera. Expect the first two weeks to look worse on time and no better on sales while the habit forms.
Who should own this in a small shop?
The service advisor who sends the most tickets, not the owner. They see every inspection before it goes out and they hear the customer response, so they know within days which captions are working.
Walk the inspection rollout with us
The checklist assumes somebody in your shop has answered the grading, caption and pay questions before a technician picks up a phone in the bay. A demo is the fastest way to see how other independent shops answered them and what week one under the lift really costs. Bring the sections you marked up and we will start there instead of at slide one.